Suports a vehicle load
of 30 tonnes
Resistant and able to withstand heavy vehicles with a ratio load/weight of 7 to 1.
Logistics and transportation volume of 12m³
This volume allows to create a stock of
dozens of bridges in the space currently occupied by only one of the alternatives.
Assembly system
using simple elements
Unlike other fast-deployment bridge alternatives, the assembly can be done easily in eight hours with a team of eight workers.
Use of latest generation reinforced materials
Ultra-light system (five tons) that makes the positioning of the bridge in difficult situations an easy task as it does not require helicopters or heavy cranes for transportation.
Inflatable technology
Completely innovative for emergency bridges. Facilitate emergency evacuation tasks and communication reestablishment of devasted areas due to natural disaster.